| 21 |
SASEC Road Connectivity Project-II: Preparation of Master Plan and Detailed Architectural Design, Drawing, Supervision and Monitoring of Road Research & Training Centre (RRTC) and Road Operation Unit (ROU)-ADB Loan No. 40540-016-BAN
|
Infrastructure & Transport |
The Roads and Highways Department (RHD) |
2018 - 2026
|
| 22 |
SASEC Road Connectivity Project-II: Preparation of Master Plan and Detailed Architectural Design, Drawing, Supervision, and Monitoring of Truck/ Heavy Vehicles Driver's Rest Areas in 3 Connecting District-ADB Loan No. 40540-016-BAN
|
Infrastructure & Transport |
The Roads and Highways Department (RHD) |
2018 - 2026
|
| 23 |
Third Party Monitoring (TPM) Consultancy Services for Municipal Governance and Services Project (MGSP) under Local Government Division (LGD)-Package No. MGSP/PMU/S-33
|
Infrastructure & Transport |
Ministry of Local Government and Cooperative (LGED & DPHE) |
2018 - 2021
|