| 151 |
Feasibility Studies and Development of New Business Models for Solar Parks at Two Sites in Bangladesh (Package-S-03) [ADB Loan 3523 BAN (COL)]
|
Power & Energy |
Power Cell |
2019 - 2021
|
| 152 |
Feasibility Study, Topography Survey, IEE, Environmental Impact Assessment (EIA) and 2D Seismic Survey for the of the Coal Deposit at Dighipara, Dinajpur under BAPEX
|
Infrastructure Development |
Bangladesh Petroleum Exploration & Production Company Limited(BAPEX). |
2014 - 2015
|
| 153 |
Feasibility Study including Environmental Impact Assessment (EIA) for Central Power Plant and Energy Efficient Lighting (Ee) in the Konabari Cluster under PaCT Project at Konabari, Gazipur, Bangladesh
|
Infrastructure Development |
Deloitte Touche Tohmatsu Limite(Deloittee). |
2015
|
| 154 |
Feasibility Study, Topography Survey, Geo Technical Investigation, IEE and Environmental Impact Assessment (EIA) for Jet A-1 Oil/ Fuel Pipeline from Main Installation, Guptakhal, Patenga, to Shah Amanat International Airport Chittagong under POCL
|
Infrastructure Development |
POCL |
2016 - 2017
|
| 155 |
Feasibility Study, Topography Survey, Geo Technical Investigation, IEE and Environmental Impact Assessment (EIA) for the Construction of the Summit Alliance Port Ltd. (SAPL) River Transport Facility in Naraynganj, Bangladesh
|
Infrastructure Development |
National Opinion Research Center(NORC). |
2016 - 2021
|
| 156 |
Conducting 03 Nos. Survey/Studies Suggested by National Trade and Transport Facilitation Committee (NTTFC) under Bangladesh Regional Connectivity Project-1 (BRCP)-IDA Credit No. 6002-BD
|
Economic & Financial Management |
Ministry of Commerce |
2019 - 2020
|
| 157 |
Consultancy Services for Conducting Study to assess the use of ICT equipment to date, Identify further needs for Effective use and Cost Effectiveness under PEDP3-ADB Loan/Grant No. 2761-BAN (SF)
|
Information & Communication Technology |
Directorate for Primary Education (DPE) |
2016
|
| 158 |
Consultancy Services for Web System Development of Installation of Pre-paid Gas Meter for Karnaphuli Gas Distribution Company Ltd. (KGDCL) under Natural Gas Efficiency Project (Loan No. BD-P78)
|
Information & Communication Technology |
Karnaphuli Gas Distribution Company Ltd. (KGDCL) |
2015 - 2019
|
| 159 |
Consultancy Services for Development e-School Grading System in Primary School under Result Based Management (RBM) Component of PEDP3-ADB Loan/ Grant No. 2761-BAN (SF)
|
Information & Communication Technology |
Directorate for Primary Education (DPE) |
2016 - 2018
|
| 160 |
Consultancy Services for Conducting Study on Present Status and Prospects of use of Web Portal in Secondary and Higher Education under BANBEIS
|
Information & Communication Technology |
Bangladesh Bureau of Educational Information and Statistics(BANBEIS). |
2015
|